Question 1

An FMEA line item has Severity = 7, Occurrence = 8, Detection = 2. What is the Risk Priority Number?

Question 2

A hypothesis test returns p = 0.04 with significance level alpha = 0.05. What is the conclusion?

Question 3

A factory inspects 500 units, each with 2 opportunities for a defect, and finds 6 defects. What is the DPMO?

Question 4

A kanban card is

Question 5

A p-chart has average fraction defective 0.1 with samples of n = 100. What are the control limits?

Question 6

During a tollgate review: the project Champion is responsible for

Question 7

A sample of n = 64 has mean 50.0 and s = 8. What is the 95% CI for the mean? (z = 1.96)

Question 8

A process has USL = 52.0, LSL = 48.0, and short-term sigma = 0.2. What is Cp?

Question 9

Which 5S step does this show? Labeling every bin location on the flow rack.

Question 10

A control chart shows seven points steadily rising toward the UCL. This pattern suggests: